ASME BPVC Section IX (2025)
Pressure equipment module
Isolated from D1.1. There is no prequalified path. Select a process, load QW-250, record the PQR, then generate production WPSs inside QW-451.1 and QW-461.9.
QW-250 by process
SMAW 253 · SAW 254 · GMAW/FCAW 255 · GTAW 256
QW-451.1 thickness
From coupon T, with QW-403.6 when impacts apply
P / F / A numbers
QW-422, QW-432, QW-442 · QW-424 substitution without impacts